**IEC 61968-11** [Energy and grid systems](https://quantlix.com/en/standards/#grid)

# IEC 61968-11: the Common Information Model for distribution

IEC 61968-11 is the international standard that extends the Common Information Model (CIM) to electricity distribution, so GIS, asset, outage and metering systems can describe the same network in the same way.

[Discuss your project](https://quantlix.com/en/contact/) [Read the key points](https://quantlix.com/en/standards/iec-61968-11/#standard-overview)

## At a glance

**Full name**

Application integration at electric utilities: System interfaces for distribution management, Part 11: Common information model (CIM) extensions for distribution

**Published by**

International Electrotechnical Commission (IEC), Technical Committee 57

**Type**

International standard

**Current version**

Edition 2.0, published 6 March 2013

**Applies to**

Distribution utilities and the vendors whose systems exchange network, asset, customer and work data

**Last reviewed**

November 16, 2026 (2026-11-16)

## In plain terms

### Key points

- It defines the distribution part of the CIM, a shared vocabulary for network equipment, assets, customers, metering and work.
- It builds on the base model in IEC 61970-301 and supports the message definitions in the other IEC 61968 parts.
- The model alone is not a complete interface. Each integration still agrees a profile, a message format and a transport.
- Edition 2.0 from 2013 is the current edition. Its stability date is 2026, so confirm the status with IEC before you pin it.

### What is IEC 61968-11?

IEC 61968-11 is **the distribution extension of the Common Information Model (CIM)**, published by the International Electrotechnical Commission. It describes the things a distribution utility works with, such as lines, switches, transformers, meters, customers, assets and work orders, and how they relate to each other.

Utilities use it so their systems can share data without inventing a new format for every connection. When the GIS, the asset system and the outage system all describe a transformer the same way, information moves between them with far less translation and far fewer surprises.

### What the standard covers

- **Assets.** The physical equipment behind the network model, with its type, ratings, condition and lifecycle.
- **Customers and metering.** Service locations, customer agreements, usage points, meters and readings.
- **Work.** Work orders, tasks and the activities that build and maintain the network.
- **Network modeling.** Edition 2.0 unified the transmission and distribution models for lines, transformers, switching and sensing equipment, so one network can be described consistently end to end.
- **Common building blocks.** Shared classes for locations, documents, organizations and flexible naming of identified objects, plus classes for single line diagrams.

### How it fits with the rest of the CIM

The CIM is a family of standards. [IEC 61970-301](https://quantlix.com/en/standards/iec-61970-301/) defines the base model for power system networks, IEC 61968-11 adds what distribution needs and IEC 62325-301 extends the model for energy markets.

The other parts of the IEC 61968 series then define interfaces between systems, for example Part 3 for network operations, Part 4 for records and asset management, Part 9 for meter reading and control and Part 100 for implementation profiles. In practice, **the model gives every system shared meaning, and a profile turns that meaning into a working interface**. Each integration still needs an agreed subset of classes, a message or file format and a transport.

### How it shows up in software projects

- **Integration design.** Each source system’s records are mapped to CIM classes, and the original identifiers are kept beside the CIM identity so nothing is lost.
- **One connected network model.** GIS, outage management and planning work from the same model, with clear rules for which system owns which data.
- **Data quality checks.** Validation covers relationships as well as fields, such as whether every meter connects to a service point and every switch to a feeder.
- **Version records.** Each interface records the edition, profile and extensions it uses, because most utilities extend the model for local needs.

### How we work with IEC 61968-11

We help utilities design integrations around CIM concepts: connecting GIS, asset management, outage and metering systems through agreed profiles, building validation for the network model and documenting every mapping so it can be maintained after go-live. This work is led by our Utilities and Infrastructure practice under [Dr. Abdel-Hadi Hor](https://quantlix.com/en/about/leadership/abdel-hadi-hor/), who has spent more than two decades connecting these systems.

We are careful about claims. A project can be designed around the CIM and its mappings documented from day one, while conformance to a particular profile is shown through testing with the actual systems involved. See how this fits into our wider work in [energy and utilities](https://quantlix.com/en/industries/energy-and-utilities/).

## Where it applies

Industries where this standard often shapes the work.

- ### [Energy & Utilities](https://quantlix.com/en/industries/energy-and-utilities/)

  Renewable energy, smart grids and energy storage systems

## Related standards

[All standards](https://quantlix.com/en/standards/)

- IEC 61970-301

  ### [The CIM base for power systems](https://quantlix.com/en/standards/iec-61970-301/)

  IEC 61970-301 is the international standard that defines the base of the Common Information Model (CIM), a shared description of power system equipment, connectivity and measurements used across grid software.
- IEC 61850

  ### [Power utility automation and substations](https://quantlix.com/en/standards/iec-61850/)

  IEC 61850 is the international standard series for communication in power utility automation, defining device data models, the SCL configuration language and fast messaging for substations and other grid assets.
- Green Button

  ### [Customer energy usage data sharing](https://quantlix.com/en/standards/green-button/)

  Green Button is the North American initiative, built on the NAESB REQ.21 ESPI standard, that lets utility customers download their energy usage data or authorize apps to receive it directly.

## Services that support this work

The services we usually bring to projects that involve this standard.

[View all services](https://quantlix.com/en/services/)

### [Enterprise applications](https://quantlix.com/en/services/enterprise-applications/)

Quantlix designs and builds enterprise applications for internal workflows, business rules and system integration, with clear access controls and maintainable architecture.

### [Data analytics](https://quantlix.com/en/services/data-analytics/)

Quantlix builds analytics pipelines and business intelligence tools that turn operational data into defined metrics, useful reports and decision support.

### [Legacy modernization](https://quantlix.com/en/services/legacy-modernization/)

Quantlix modernizes existing systems through targeted changes, integration and staged migration, preserving essential business behavior while addressing technical constraints.

## Questions, answered

What teams usually ask us about this standard.

**Is IEC 61968-11 the same as the CIM?**

It is one part of it. The CIM is a family of IEC standards: IEC 61970-301 defines the base model for power systems, IEC 61968-11 extends it for distribution and IEC 62325-301 extends it for energy markets.

**What is the latest edition of IEC 61968-11?**

Edition 2.0, published on 6 March 2013, which replaced the first edition of 2010. When we checked the IEC webstore in November 2026, no newer edition was listed. Its stability date is 2026, so check the status again before you pin an edition in a contract.

**Which file or message format does IEC 61968-11 use?**

None by itself. The standard defines the information model. Formats come from other parts and profiles, such as IEC 61968-100 for application integration messages and IEC 61970-552 for CIM XML model exchange.

**Do we need the CIM to connect our GIS and outage systems?**

Not strictly, but it helps a great deal. A direct mapping works for one connection and becomes hard to maintain as more systems join. A shared CIM-based model gives every system one agreed meaning to map to.

**Can software be certified against IEC 61968-11?**

The model is not a certification scheme. Interoperability is shown by testing a specific profile, version and pair of systems, for example in the CIM interoperability tests organized by the UCA International Users Group.

## Official sources

Read the official text before relying on any detail. What applies to you depends on your role, your location and the version in force.

- [IEC 61968-11:2013 on the IEC webstore](https://webstore.iec.ch/en/publication/6199)
- [IEC 61970-301:2020+AMD1:2022 (CIM base)](https://webstore.iec.ch/en/publication/74467)
- [IEC 61968-100:2022 (implementation profiles)](https://webstore.iec.ch/en/publication/67766)

These guides explain each standard in plain terms. They are not legal advice, and they do not state that any product or organization conforms to a standard.

## Planning software around this standard?

Tell us which systems are involved and what you need to show. We will help you build the requirements in from the start.

[Discuss your project](https://quantlix.com/en/contact/)