**IEC 60870-5-104** [Energy and grid systems](https://quantlix.com/en/standards/#grid)

# IEC 60870-5-104: telecontrol over TCP/IP networks

IEC 60870-5-104 is the international telecontrol standard that carries IEC 60870-5-101 messages over TCP/IP, so control centers can monitor and control substations and other remote sites over IP networks.

[Discuss your project](https://quantlix.com/en/contact/) [Read the key points](https://quantlix.com/en/standards/iec-60870-5-104/#standard-overview)

## At a glance

**Full name**

Telecontrol equipment and systems, Part 5-104: Transmission protocols, Network access for IEC 60870-5-101 using standard transport profiles

**Published by**

International Electrotechnical Commission (IEC), Technical Committee 57

**Type**

International standard (telecontrol companion standard)

**Current version**

Consolidated Edition 2.1 (2006 edition with Amendment 1), published 7 June 2016, with Corrigendum 1 of 25 August 2023; stability date 2026

**Applies to**

Utilities, grid operators and vendors linking control centers with substations, RTUs and other geographically spread telecontrol equipment

**Last reviewed**

November 16, 2026 (2026-11-16)

## In plain terms

### Key points

- It reuses the application data units of IEC 60870-5-101 and carries them over TCP, on registered port 2404.
- Three frame formats handle numbered data, acknowledgments and link control such as start, stop and test.
- Consolidated Edition 2.1 of 2016 is current, and the corrigendum of August 2023 is included in the copy IEC sells.
- Every link depends on an interoperability list that records which options each side actually supports.
- IEC 62351-5 adds application-level security, and IEC 62351-3 defines the TLS profile for TCP/IP links.

### What is IEC 60870-5-104?

IEC 60870-5-104 is **the international standard for running telecontrol over TCP/IP networks**, often shortened to IEC 104. Published by the International Electrotechnical Commission, it is a companion standard that takes the application messages defined in IEC 60870-5-101 for serial lines and carries them over standard transport profiles.

It exists so control centers can supervise geographically spread equipment, such as substations, RTUs and generation sites, over modern IP networks while keeping a well-understood message set. IEC describes its purpose as interoperability among compatible telecontrol equipment from different vendors.

### What IEC 60870-5-104 covers

- **Station roles.** A controlling station, usually in the control center, and controlled stations in the field, connected over TCP.
- **Frame formats.** I-format frames carry numbered information, S-format frames acknowledge what was received and U-format frames start, stop and test the data transfer.
- **Application data.** ASDUs (application service data units) from IEC 60870-5-101 identify each value by type, cause of transmission, common address and information object address, with time tags where needed.
- **Functions.** General interrogation, spontaneous and cyclic reporting, clock synchronization, counter interrogation and commands such as single, double and set point commands.
- **Flow control and timers.** Parameters k and w limit how many frames can be outstanding before acknowledgment, and timeouts detect a silent or failed connection.

### How a 104 link works

A link starts when the controlling station opens a TCP connection, normally to port 2404, and sends a start command. **From then on, every information frame carries send and receive sequence numbers**, so both sides can tell whether anything was lost, and an idle link is checked with test frames. After a connection drops, the controlling station typically runs a general interrogation to rebuild its picture of the field.

The working details live in the interoperability list. Each side states which ASDU types, address sizes, time formats and parameters it supports, and the two must be compatible for the link to work. Security comes from the IEC 62351 series: Part 3 (Edition 2.0, 2023) profiles TLS 1.2 and 1.3 for TCP/IP links, and Part 5 (Edition 1.0, 2023) adds authentication and authenticated encryption at the application layer for the IEC 60870-5 family. Our [IEC 62351](https://quantlix.com/en/standards/iec-62351/) guide explains how the parts fit together.

### How it shows up in software projects

- **Address plans.** Common addresses and information object addresses are mapped to tags in a documented table, with their types, scaling and units.
- **Time tags and quality.** Values keep their time tags and quality descriptors, such as invalid, not topical or substituted, and the software records whether time came from the device or was added on receipt.
- **Redundant connections.** The standard supports redundant connections, so software must handle a switch from one connection to another without duplicating or losing events.
- **Command safety.** Monitoring and control are separated, and commands use select-before-execute where the utility requires it.
- **Interoperability testing.** A simulator built from the counterpart’s interoperability list catches mismatches in address sizes or time formats before go-live.

### How we work with IEC 60870-5-104

We build adapters and gateways that bring IEC 104 data into historians, analytics and enterprise systems, generate and check address mappings, and set up simulators so mappings can be tested away from live equipment. Where older serial IEC 101 links are moving to IP, we help plan the change and the documentation that goes with it through our [legacy modernization](https://quantlix.com/en/services/legacy-modernization/) work.

Device conformance and the decision to allow control over a link belong to the utility and its vendors, and our software respects those choices. [Dr. Abdel-Hadi Hor](https://quantlix.com/en/about/leadership/abdel-hadi-hor/) leads this telecontrol work within our Utilities and Infrastructure practice. For the wider picture, see [energy and utilities](https://quantlix.com/en/industries/energy-and-utilities/) and our [DNP3](https://quantlix.com/en/standards/dnp3/) guide.

## Where it applies

Industries where this standard often shapes the work.

- ### [Energy & Utilities](https://quantlix.com/en/industries/energy-and-utilities/)

  Renewable energy, smart grids and energy storage systems

## Related standards

[All standards](https://quantlix.com/en/standards/)

- DNP3

  ### [SCADA protocol for field devices](https://quantlix.com/en/standards/dnp3/)

  DNP3 is the Distributed Network Protocol, standardized as IEEE 1815, that SCADA masters use to poll and control RTUs and IEDs in electric, water and other utilities, with event reporting and time-stamped data.
- IEC 61850

  ### [Power utility automation and substations](https://quantlix.com/en/standards/iec-61850/)

  IEC 61850 is the international standard series for communication in power utility automation, defining device data models, the SCL configuration language and fast messaging for substations and other grid assets.
- IEC 62351

  ### [Security for power system protocols](https://quantlix.com/en/standards/iec-62351/)

  IEC 62351 is the IEC series that adds authentication, encryption, access control and key management to the communication protocols that run power systems, such as IEC 61850, IEC 60870-5 and DNP3.
- IEC 61970-301

  ### [The CIM base for power systems](https://quantlix.com/en/standards/iec-61970-301/)

  IEC 61970-301 is the international standard that defines the base of the Common Information Model (CIM), a shared description of power system equipment, connectivity and measurements used across grid software.

## Services that support this work

The services we usually bring to projects that involve this standard.

[View all services](https://quantlix.com/en/services/)

### [IoT and edge computing](https://quantlix.com/en/services/iot-edge-computing/)

Connect machines, sensors and business software with assessed IoT and edge integrations. Define data meaning, connectivity, permitted actions and recovery.

### [Enterprise applications](https://quantlix.com/en/services/enterprise-applications/)

Quantlix designs and builds enterprise applications for internal workflows, business rules and system integration, with clear access controls and maintainable architecture.

### [Legacy modernization](https://quantlix.com/en/services/legacy-modernization/)

Quantlix modernizes existing systems through targeted changes, integration and staged migration, preserving essential business behavior while addressing technical constraints.

## Questions, answered

What teams usually ask us about this standard.

**What is the difference between IEC 60870-5-101 and 104?**

IEC 60870-5-101 is the companion standard for serial links. IEC 60870-5-104 takes the same application messages and carries them over TCP/IP, replacing the serial link layer with its own control frames.

**What is the latest edition of IEC 60870-5-104?**

Consolidated Edition 2.1, published on 7 June 2016, which combines the 2006 second edition with its Amendment 1. Corrigendum 1, published on 25 August 2023, is included in the copy IEC sells. The stability date is 2026, so check the webstore before you pin an edition.

**Which port does IEC 60870-5-104 use?**

IANA registers TCP port 2404 for IEC 60870-5-104 process control over IP. Operators sometimes use other ports, so confirm the configuration for each link.

**How is IEC 60870-5-104 secured?**

IEC 62351-3 (Edition 2.0, 2023) defines a TLS profile for TCP/IP protocols such as this one, and IEC 62351-5 (Edition 1.0, 2023) adds application-level authentication and authenticated encryption for the IEC 60870-5 family. Network segmentation and monitoring remain part of the design.

**Should we choose IEC 60870-5-104 or IEC 61850?**

They solve different problems. IEC 60870-5-104 links control centers to remote sites, while IEC 61850 models and connects devices inside substations and plants. Many utilities use both, and IEC TS 61850-80-1 describes how to exchange IEC 61850 data over IEC 60870-5-104.

## Official sources

Read the official text before relying on any detail. What applies to you depends on your role, your location and the version in force.

- [IEC 60870-5-104:2006+AMD1:2016 on the IEC webstore](https://webstore.iec.ch/en/publication/25035)
- [IEC 60870-5-104 Corrigendum 1 (2023)](https://webstore.iec.ch/en/publication/87194)
- [IEC 62351-5:2023 (security for IEC 60870-5)](https://webstore.iec.ch/en/publication/65511)
- [IEC 62351-3:2023 (TLS profiles for TCP/IP)](https://webstore.iec.ch/en/publication/68410)

These guides explain each standard in plain terms. They are not legal advice, and they do not state that any product or organization conforms to a standard.

## Planning software around this standard?

Tell us which systems are involved and what you need to show. We will help you build the requirements in from the start.